432 F.Supp.3d 1003
Only the Westlaw citation is currently available.
United States District Court, D. Alaska.
NATIVE VILLAGE OF NUIQSUT, et al., Plaintiffs,
v.
BUREAU OF LAND MANAGEMENT, et al., Defendants,
and
ConocoPhillips Alaska, Inc., Intervenor-Defendant.
Case No. 3:19-cv-00056-SLG
|
Signed 01/09/2020
DECISION AND ORDER
Sharon L. Gleason, UNITED STATES DISTRICT JUDGE
This is an action in which Plaintiffs, comprised of Native Village of Nuiqsut, Alaska Wilderness League, Center for Biological Diversity, Friends of the Earth, Natural Resources Defense Council, and Sierra Club, seek the invalidation of the Bureau of Land Management’s approval of the 2018-2019 winter exploration activity undertaken by ConocoPhillips Alaska, Inc. in the National Petroleum Reserve-Alaska.1 For the reasons set forth herein, Plaintiffs’ requested relief is denied.
BACKGROUND
The National Petroleum Reserve-Alaska (“NPR-A”), on Alaska’s North Slope, consists of 23.6 million acres and is the nation’s largest single unit of public land.2 Established as the Naval Petroleum Reserve in 1923, the NPR-A was renamed and placed under the authority of the Secretary of the Interior in 1976 by the National Petroleum Reserve Protection Act (“NPRPA”), 42 U.S.C. § 6501 et seq.3 In 1980, the NPRPA was amended to direct the Secretary of the Interior to “conduct an expeditious program of competitive leasing of oil and gas in the Reserve.”4
The NPRPA provides that exploration within designated areas “containing any significant subsistence, recreational, fish and wildlife, or historical or scenic value, shall be conducted in a manner which will assure the maximum protection of such surface values to the extent consistent with the requirements of this Act for the exploration of the reserve.”5 The Teshekpuk Lake Special Area—an approximately 1.7 million-acre area containing “Teshekpuk Lake and its watershed”—is one such designated area.6 This area “includes important nesting, staging, and molting habitat for a large number of waterfowl and shorebirds and critical Teshekpuk Caribou Herd caribou calving, migration, and insect-relief habitat.”7
In 1994, the discovery of a large oil field on state land near the eastern border of the NPR-A spurred “renewed interest in leasing in the Reserve.”8 Additional discoveries in the northeastern portion of the NPR-A led to the creation of the Greater Mooses Tooth (“GMT”) and the Bear Tooth exploratory units.9 Between 2000 and 2012, operators drilled 29 exploration wells in the NPR-A.10 Fifteen of these wells were drilled in the GMT unit and one was drilled in the Bear Tooth unit.11
In 2012, the Bureau of Land Management (“BLM”) published a final integrated activity plan (“IAP”) and supporting environmental impact statement (“EIS”) (together the “2012 IAP/EIS”) to govern its management of “all BLM-managed lands in the [NPR-A].”12 The subsequent Record of Decision (“ROD”) adopted Alternative B-2 of the IAP/EIS, which made 11.8 million acres—or 52%—of the NPR-A available for oil and gas leasing.13 It kept much of the Teshekpuk Lake Special Area closed to leasing.14 However, it made “lands in the eastern-most part of [that area] available for oil and gas leasing” because they “include or are close to existing leases, including those with oil discoveries in the [GMT] Unit ... [and] offer the greatest promise for oil and gas development.”15 The ROD also adopted a series of lease stipulations and best management practices (“BMPs”), which are mitigation measures “required, implemented, and enforced at the operational level for all authorized (not just oil and gas) activities in the planning area.”16
Previously, in 2004, BLM had prepared an EIS and approved ConocoPhillips’ proposal to expand its existing operations on state land by constructing satellite drill pads in the NPR-A.17 Two of these pads—GMT1 and GMT2—lie within the GMT unit.18 In October 2014, BLM completed a supplemental EIS to analyze revisions that ConocoPhillips had made to its plan for the development of the GMT1 drill pad.19 The agency approved the revised plan for that drill pad in a February, 2015 ROD.20 BLM approved revisions to ConocoPhillips’ development plan for the GMT2 drill pad through a similar process, completing a supplemental EIS in August 2018 and issuing a ROD approving the revisions in October, 2018.21
In 2013, 2015, 2017, and 2018, BLM approved a series of winter exploratory drilling programs within the NPR-A, which included the construction of wells and associated access route corridors and water supply.22 Each of these programs was approved after BLM completed an Environmental Assessment (“EA”) and made a finding of no significant impact (“FONSI”) or a finding of no new significant impact (“FONNSI”) beyond those already considered in previous EISs.23
In August, 2018, ConocoPhillips completed an Exploration and Appraisal Program describing activities it planned to conduct during the 2018-2019 winter season to “explore and appraise oil and gas potential on” leases it owned within the NPR-A.24 The proposed exploration would occur to the west of Nuiqsut and the GMT1 and GMT2 projects, in the Bear Tooth unit near the confluence of Fish and Judy Creeks.25 In support of its exploration plan, ConocoPhillips submitted to BLM in October 2018 an application for a right-of-way grant,26 requests to deviate from several of the 2012 IAP/EIS BMPs,27 and applications for permits to drill up to six exploration wells in or near the Bear Tooth unit.28
BLM released a preliminary EA analyzing ConocoPhillips’ proposed operations on November 9, 2018.29 After the requisite public comment period had closed, the agency published a final EA on December 6, 2018 (“2018 EA”), which proposed approving ConocoPhillips’ various applications and requests.30 The 2018 EA tiered to the 2012 IAP/EIS and the supplemental EISs for the GMT1 and GMT2 drill pads.31 BLM then issued a FONNSI,32 and released a ROD that, among other things, authorized ConocoPhillips to conduct exploration drilling and testing at up to eight well sites and build associated infrastructure, including up to 57 miles of ice roads, 42.7 miles of snow trails, 23 ice pads, an air strip, and temporary housing for its employees during the 2018-2019 winter season.33 ConocoPhillips fully completed the operations authorized by the ROD on April 28, 2019.34
Several other projects occurred in the northeast of the NPR-A during the 2018-2019 winter season as well. The largest of these was construction of the road and drill pad for the GMT2 development.35 ConocoPhillips also obtained authorization to engage in geotechnical exploration in the area, in order to locate “potential gravel resources” to “support[ ] oil and gas development in the Bear Tooth Unit.”36 This exploration program consisted of drilling up “up to 125 onshore boreholes” and “up to 40 nearshore boreholes” in search of gravel.37 The majority of the onshore borehole drilling occurred in the vicinity of the GMT1 and GMT2 projects, with a smaller number of boreholes drilled in the area of ConocoPhillips’ 2018-2019 winter exploration.38 The nearshore borehole drilling occurred several miles north, off Atigaru Point.39 ConocoPhillips’ winter exploration and geotechnical survey both supported the company’s plan to develop the Willow prospect, for which BLM is preparing an EIS.40
Nuiqsut is a predominantly Alaska Native community of nearly 500 people located on the eastern border of the NPR-A.41 In recent decades, several oil and gas development projects have been undertaken near Nuiqsut, which is “situated closer to current and foreseeable areas of petroleum development than any other community on the North Slope.”42 This development has created conflicts with the community’s traditional ways of life. A comment from the North Slope Borough on the GMT2 SEIS explained:
Nuiqsut residents, more so than residents of other North Slope communities, and perhaps more so than any other Alaskan residents, have lived with a decades-long, ever-increasing, near constant level of frustration and apprehension as expanding oil and gas facilities and operations have impinged upon their traditional onshore and offshore subsistence harvest areas.43
Many of ConocoPhillips’ activities during the winter of 2018-2019 occurred in the general vicinity of Nuiqsut. The ice road construction and drilling associated with the winter exploration program occurred largely 25 miles or more to the west of the community.44 The GMT2 development is closer to Nuiqsut; the drill pad site “lies approximately 16.5 miles west of Nuiqsut,” and connects to the GMT1 drill site by an access road extending towards the northwest.45 Maps showing the locations of development relative to Nuiqsut are included in an appendix to this decision.46
The Native Village of Nuiqsut47 and several non-profit organizations initiated this action on March 1, 2019, claiming that BLM’s environmental analysis of ConocoPhillips’ 2018-2019 winter exploration plan was deficient in several ways, and seeking declaratory and injunctive relief.48 Plaintiffs filed an Amended Complaint on March 26, 2019, which contained five claims for relief:
(1) That BLM’s FONNSI for the winter exploration program, and its associated decision not to prepare an EIS, failed to account for significant impacts to the Teshekpuk Caribou Herd and subsistence activity and was thus in violation of the National Environmental Policy Act (“NEPA”), 42 U.S.C. § 4332(2)(C), and the Administrative Procedure Act (“APA”), 5 U.S.C. § 706(2);49
(2) That BLM’s FONNSI, and associated decision not to prepare an EIS, failed to consider the cumulative impacts of the winter exploration program, and thus violated NEPA, 42 U.S.C. § 4332(2)(C), and the APA, 5 U.S.C. § 706(2);50
(3) That “BLM’s failure to consider the winter exploration program and geotechnical exploration program together in a single EIS” violated NEPA, 42 U.S.C. § 4332(2)(C), its implementing regulations, 40 C.F.R. § 1508.25, and the APA, 5 U.S.C. 706(2);51
(4) That BLM failed to consider appropriate alternatives to ConocoPhillips’ proposed winter exploration plan, in violation of NEPA, 42 U.S.C. § 4332(2)(C), its implementing regulations, 40 C.F.R. §§ 1507.2(d), 1508.9(b), and the APA, 5 U.S.C. §§ 702, 706;52 and
(5) That BLM failed to consider alternatives to the winter exploration plan that would reduce the impact to subsistence uses of the affected areas, in violation of the Alaska National Interest Lands Conservation Act (“ANILCA”), 16 U.S.C. § 3120(a), and the APA, 5 U.S.C. §§ 702, 706.53
The Amended Complaint requested declaratory relief, an order vacating the ROD for the 2018-2019 winter exploration, and an injunction prohibiting “further exploration activities in the [Petroleum] Reserve until BLM has complied with the requirements of NEPA and ANILCA.”54 However, in their briefing on the merits, Plaintiffs seek only declaratory relief and vacatur.55
The Court granted ConocoPhillips’ Motion to Intervene on April 10, 2019,56 and the company answered the Amended Complaint on April 12, 2019.57 Federal Defendants filed their answer on May 6, 2019.58 Plaintiffs filed their opening brief on the merits on May 23, 2019.59
JURISDICTION
“It is an inexorable command of the United States Constitution that the federal courts confine themselves to deciding actual cases and controversies.”60 This case-or-controversy requirement “underpins both ... standing and ... mootness jurisprudence.”61 Standing and mootness are related, but distinct legal concepts.62 The standing inquiry asks whether a case or controversy existed at the time a complaint was filed;63 the mootness inquiry asks whether that case or controversy “persist[s] throughout all stages of the litigation.”64
ConocoPhillips argues that Plaintiffs do not have standing to challenge the EA for the 2018-19 winter exploration,65 and Federal Defendants and ConocoPhillips both argue that Plaintiffs’ claims are moot.66 The Court will address these two arguments separately, beginning with standing.67
I. Standing
To establish Article III standing, a plaintiff “must have (1) suffered an injury in fact, (2) that is fairly traceable to the challenged conduct of the defendant, and (3) that is likely to be redressed by a favorable judicial decision.”68 At the summary judgment stage, plaintiffs must submit evidence, such as affidavits, showing that each of these elements is met through specific facts.69 Plaintiffs submitted nine declarations from their members in an effort to carry this burden.70
ConocoPhillips contends that Plaintiffs have failed to establish each of these three elements.71 ConocoPhillips’ briefing relies heavily on the fact that the winter exploration program challenged by Plaintiffs had concluded by the time they filed their opening brief.72 However, ConocoPhillips’ arguments about the timing of the challenges to its winter exploration are more relevant to the question of mootness, which is discussed separately below.73 As explained above, the standing inquiry focuses on the plaintiff’s position at the time the operative complaint was filed; consistent with the “general rule that standing is determined ‘at the time the action commences.’ ”74 The Court will thus consider whether Plaintiffs established that each of the standing elements existed at the time the Amended Complaint was filed, in March, 2019, when exploration activities were ongoing.75
A. Injury-in-Fact
The injury-in-fact element requires Plaintiffs to show that they have suffered an injury that is “(a) concrete and particularized and (b) actual or imminent, not conjectural or hypothetical.”76 If “plaintiffs seek declaratory and injunctive relief only,” as here, “there is a further requirement that they show a very significant possibility of future harm.”77
The Native Village of Nuiqsut satisfied this burden through the declarations of its tribal members. For example, Martha Itta, the Tribal Administrator for the Native Village of Nuiqsut,78 stated that “[ConocoPhillips’] exploration activities and other oil activities in the region affect every aspect of our lives[;] ... [t]here is 24-7 never-ending traffic during ice road season, nonstop noise pollution.”79 And the EA itself recognized that the winter exploration’s “[p]roximity to the community [of Nuiqsut] is a key concern for residents, particularly in terms of air quality and noise.”80 It explained that while the planned winter exploration activities “would not easily be discernible” from other oil and gas development projects in the area, residents “will generally be aware of the unprecedented scale and extent of activity on the west side [of Nuiqsut] this season.”81 Noise and light pollution are concrete injuries sufficient to establish injury-in-fact.82
Further, tribal members described in their declarations a fear that ConocoPhillips’ winter exploration activities would interfere with subsistence uses of the affected area. For example, Tribal Administrator Itta stated that “[t]he area where [ConocoPhillips] conducts its current winter exploration activities is ... where [tribal members] fish and hunt,” but that she has not been “able to utilize [her] family’s traditional camps [in the Teshekpuk Lake area] due to infrastructure and the animals no longer going to those areas.”83 The EA also recognizes these concerns, stating that the winter exploration “would ... encompass a large area around Fish Creek, which is an important area for wintertime caribou hunting,” on which “Nuiqsut residents place extreme value.”84 It recognized that “[t]he proposed action is anticipated to deflect caribou and furbearers from the area” and that “[s]ubsistence hunters would likely avoid the area.”85 Accordingly, the Court finds that the Native Village of Nuiqsut has established injury-in-fact.
Members of at least some of the plaintiff environmental organizations, through their declarations, also identified concrete and imminent harm they feared they would suffer as a result of ConocoPhillips’ winter exploration. The Supreme Court has held that “environmental plaintiffs adequately allege injury-in-fact when they aver that they use the affected area and are persons ‘for whom the aesthetic and recreational values of the area will be lessened’ by the challenged activity.”86
For example, Jeffrey Scott Fair, a member of the NRDC, is a wildlife biologist who has researched yellow-billed loons in the area of ConocoPhillips’ 2018-2019 winter exploration.87 He describes his concern that ice-road construction during the exploration season could harm loons directly by artificially lowering the water level of the lakes by which they nest in the spring: the loons “need to nest right at the water line,” but “[g]iven the likelihood that these lakes would refill later in the early nesting season (from their unnatural drawdowns), rising waters would flood and kill the loon nests.”88 Mr. Fair states that he plans to revisit loon sites “for comparison and follow-up” and that he is currently “awaiting acceptance and funding for a red-throated loon study ..., potentially including areas within approximately 20 miles of the exploration area” as early as summer, 2020.89
Dan Ritzman, a member of both the Sierra Club and Alaska Wilderness League,90 stated that he had plans to float “portions of the Nigu, Etivlik and Colville rivers” in the summer of 2020,91 but feared that “noise impacts from exploration drilling, development, and production activities will drive away wildlife from ... the critical areas around Teshekpuk Lake,” and thus “significantly decrease or completely erase [his] opportunity to enjoy wildlife viewing” on his upcoming trip.92
ConocoPhillips maintains that Plaintiffs’ declarations are deficient and do not show impending harm because “they surmise about effects that they believe could occur—despite the fact that the declarations were submitted after the program completed—and identify no harms that actually occurred.”93 ConocoPhillips mischaracterizes Plaintiffs’ burden; as explained above, the standing inquiry focuses on Plaintiffs’ position at the filing of the Amended Complaint, not the filing of their opening brief on the merits.94 Viewed through this lens, the above quoted declarations filed with Plaintiffs’ briefing demonstrate that members of at least some plaintiff organizations had articulated sufficiently specific concerns about how the winter exploration would “affect [their] recreational, aesthetic, and economic interests.”95
For the foregoing reasons, the Native Village of Nuiqsut, NRDC, Sierra Club, and Alaska Wilderness League have met their burden to show a concrete, imminent injury-in-fact. The Court finds that the Friends of the Earth and the Center for Biological Diversity have not met this burden, however, and dismisses them from the case.
B. Causation
ConocoPhillips maintains that “[t]he completed 2018-19 Program either caused harm to Plaintiffs or did not,” and contends that “Plaintiffs have presented no evidence from which th[e] Court can conclude that any of the Plaintiffs suffered injury due to the 2018-19 Program.”96 ConocoPhillips’ argument again focuses on the facts as they were at the time of Plaintiffs’ opening brief, when winter exploration had completed, rather than the facts at the time the Amended Complaint was filed, when exploration activities were still ongoing.
As explained above, certain Plaintiffs have demonstrated that they had been injured and reasonably feared continuing and imminent future injury at the time the Amended Complaint was filed. They have also shown that that injury would be “fairly traceable” to ConocoPhillips’ winter exploration.97 For example, Mr. Fair explained how the construction of ice roads could impact loon habitat,98 and Tribal Administrator Itta explained that exploration activities cause noise and light pollution and impact subsistence uses of the Teshekpuk Lake area.99 And, as noted above, the EA itself recognized that winter exploration would cause subsistence users to avoid the area.100
C. Redressability
ConocoPhillips argues that “a declaration from th[e] Court that BLM did not comply with NEPA or ANILCA ... would not redress any ... injury” suffered by Plaintiffs because the “2018-19 Program, including demobilization, is complete.”101 However, exploration was ongoing at the time the Amended Complaint was filed, and a declaratory judgment and vacatur of the EA, at that point in time, would have caused exploration to cease and thus redressed Plaintiffs’ injuries. Accordingly, the Court finds that Plaintiffs have established the elements of standing as of March 26, 2019, the date of the Amended Complaint.
II. Mootness
“A case becomes moot only when it is impossible for a court to grant ‘any effectual relief whatever’ to the prevailing party.”102 “[T]he burden of demonstrating mootness is a heavy one.”103 Federal Defendants and ConocoPhillips argue that Plaintiffs’ claims are moot because the 2018-2019 winter exploration program they challenge has already been completed.104 Federal Defendants maintain that “there is no effective relief the Court can order here with the Program completed and the wells suspended.”105
Plaintiffs argue that their claims fit within the “capable of repetition yet evading review” exception to the mootness doctrine. This “exception applies when (1) the duration of the challenged action is too short to allow full litigation before it ceases or expires, and (2) there is a reasonable expectation that the plaintiffs will be subjected to the challenged action again.”106.
Beginning with the first prong, “[a]n action is ‘fully litigated’ if it is reviewed by [a court of appeals] and the Supreme Court.”107 In Shell Offshore, Inc. v. Greenpeace, Inc., the Ninth Circuit held that a preliminary injunction “limited to a total duration of less than seven months” could not be fully litigated before expiring, concluding that “[o]rders of such inherently limited duration will almost always evade full review.”108 The EA at issue in this case authorized winter exploration that began in December, 2018 and concluded in April, 2019, a period of only five months.109 BLM’s approval of the 2018-2019 winter exploration in the NPR-A is thus precisely the sort of short-term action that evades judicial review.
Defendants contend that this is a problem of Plaintiffs’ own making. They maintain that Plaintiffs could have brought their case sooner and moved for a preliminary injunction of the winter exploration in order to preserve the issue for judicial review.110 Plaintiffs did not file the initial complaint in this case until March 1, 2019, well after ConocoPhillips’ winter exploration had begun.111 A preliminary injunction, if entered, may have prevented the initiation or completion of the winter exploration. However, no judicial relief could have prevented the expiration of the authorization provided by the EA before it could be fully litigated.112
Turning to the second prong, Plaintiffs argue that BLM is likely to authorize winter exploration in the area again, using the same, allegedly deficient environmental review.113 BLM has repeatedly authorized winter exploration programs in the NPR-A after completing an EA and issuing a FONNSI.114 Neither Federal Defendants nor ConocoPhillips dispute the company’s continued interest in conducting winter exploration in the area. Indeed, the Court takes judicial notice of the fact that ConocoPhillips has since proposed winter exploration for 2019-2020 in the same area as the 2018-2019 exploration at issue in this case,115 and that BLM has again completed an EA to review impacts of the proposed activity.116
Defendants argue, instead, that Plaintiffs’ claims are moot because the specific EA and exploration activities in question cannot, by their very nature, recur.117 They cite Friends of the Earth, Inc. v. Bergland, where the Ninth Circuit held that a challenge to exploratory mining operations in Montana’s Stillwater Complex was mooted by the termination of activity.118 In that case, the mining operator ceased exploration when it struck water.119 As a result, the Circuit reasoned that “[t]here [was] no reasonable possibility ... that [the mining operator] will resume or repeat the exploratory operation which plaintiffs previously sought to enjoin.”120 The Ninth Circuit dismissed the plaintiffs’ argument that future exploration was likely to occur in other areas within the broader Stillwater Complex, stating that “relief under NEPA must be tailored to remedy the particular violations in the case.”121
This case is distinguishable. In Bergland, the agency had determined that no EIS was needed for the mining activity at issue.122 But the Ninth Circuit’s opinion in that case gives no indication that the NEPA analysis for that mining exploration case was tiered to any project-level analyses, on which the agency may rely to authorize future exploratory projects. Further, unlike in Bergland, Plaintiffs have here introduced evidence that ConocoPhillips plans to return to the same general location of its 2018-2019 winter exploration to conduct further exploratory drilling,123 not to “other places ... in the” NPR-A.124
In this case, while the 2018 EA and the exploration it authorized cannot themselves be repeated, the Court finds it quite likely that BLM will authorize future winter exploration in the Teshekpuk Lake Area using an EA that tiers to the 2012 IAP/EIS and the GMT1 and GMT2 SEISs to support conclusions regarding impacts to caribou and subsistence uses. In Greenpeace Action v. Franklin, the Ninth Circuit held that a challenge to the National Marine Fisheries Service’s total allowable catch (“TAC”) for 1991 fell into the capable of repetition yet evading review exception to the mootness doctrine.125 Although the TAC had expired, the Circuit concluded that “[t]he major issue—whether the Secretary has adequately examined the effects of pollock fishing on the Steller sea lions—is likely to recur in future years,” noting that the agency had relied on the same biological opinion to support the 1992 TAC that it had used for the 1991 TAC.126 Similarly, it appears likely that additional NEPA analyses for future exploration in the NPR-A will tier to and rely on the 2012 IAP/EIS, the GMT1 SEIS, and the GMT2 SEIS in the same manner as the 2018 EA.127
Based on the foregoing, the Court finds that the challenged action is capable of repetition yet evades review and that the exception to the mootness doctrine applies. Accordingly, the Court turns to the merits of Plaintiffs’ arguments.
LEGAL STANDARD
I. Administrative Procedure Act
The Court reviews Federal Defendants’ compliance with NEPA and ANILCA under the Administrative Procedure Act.128 A reviewing court may not set aside an agency’s decision unless it is “arbitrary, capricious, an abuse of discretion, or otherwise not in accordance with law.”129 Agency action is arbitrary and capricious if it
relie[s] on factors which Congress has not intended it to consider, entirely fail[s] to consider an important aspect of the problem, offer[s] an explanation for its decision that runs counter to the evidence before the agency, or is so implausible that it c[an]not be ascribed to a difference in view or the product of agency expertise.130
A court’s review of whether an agency action is arbitrary and capricious should be “searching and careful,” but “narrow,” as a court may not substitute its judgment for that of the administrative agency.131 Courts will generally “uphold agency decisions so long as the agencies have ‘considered the relevant factors and articulated a rational connection between the factors found and the choices made.’ ”132
II. National Environmental Policy Act
Pursuant to NEPA, an agency must prepare an EIS before taking an action “significantly affecting the quality of the human environment.”133 An agency may prepare an EA in order to determine whether an action significantly affects the environment, such that an EIS is necessary.134 If, based on the EA, the agency finds that the action will have no significant impact, it need not complete an EIS;135 however, “if substantial questions are raised as to whether a project ... may cause significant degradation of some human environmental factor,” the “agency must prepare an EIS.”136 “If an agency decides not to prepare an EIS, it must supply a ‘convincing statement of reasons’ to explain why a project’s impacts are insignificant.”137
“Courts apply a ‘rule of reason’ standard in reviewing the adequacy of a NEPA document.”138 This inquiry “involves ‘a pragmatic judgment whether the [document’s] form, content, and preparation foster both informed decision-making and informed public participation.’ ”139 “Alternatively phrased, the task is to ensure that the agency has taken a ‘hard look’ at the potential environmental consequences of the proposed action.”140
NEPA’s implementing regulations provide that “[a]gencies are encouraged to tier their environmental impact statements to eliminate repetitive discussions of the same issues and to focus on the actual issues ripe for decision at each level of environmental review.”141 ConocoPhillips and Plaintiffs argue over the correct standard for reviewing EAs that tier to previously completed EISs. Quoting the Ninth Circuit, ConocoPhillips maintains that “[a] comprehensive programmatic impact statement generally obviates the need for a subsequent site-specific or project specific impact statement, unless new and significant environmental impacts arise that were not previously considered.”142 Plaintiffs respond that “[t]iering satisfies BLM’s NEPA obligations only to the extent that the tiered-to documents contain sufficient analysis to support conclusions regarding site-specific impacts.”143
These positions are not inconsistent; Plaintiffs and ConocoPhillips each make a correct statement of the applicable standard, although they emphasize different aspects of that standard. A programmatic, or broad-level EIS “must provide ‘sufficient detail to foster informed decision-making’ ” but need not evaluate “site-specific impacts ... until a critical decision has been made to act on site development.”144 The fact that an “EIS contains sufficient analysis for informed decision-making at the programmatic level does not reduce or minimize [an agency’s] critical duty to ‘fully evaluate[ ]’ site-specific impacts” at later stages of review.145 However, when a programmatic EIS does adequately consider the impacts of subsequent site-specific projects, a subsequent NEPA document need not repeat that analysis “unless new and significant environmental impacts arise that were not previously considered.”146
Tiering promotes efficiency; it allows an agency to take the requisite “ ‘hard look’ at the potential environmental consequences of [a] proposed action”147 without treading the same ground twice. Department of Interior regulations describe this balance well: “An environmental assessment may be prepared, and a finding of no significant impact reached, for a proposed action with significant effects, whether direct, indirect, or cumulative, if the environmental assessment is tiered to a broader environmental impact statement which fully analyzed those significant effects.”148 This does not, however, relieve the agency of its burden to provide a “ ‘convincing statement of reasons’ to explain why” a project will not result in impacts beyond those previously considered.149
III. Alaska National Interest Lands Conservation Act
Congress enacted ANILCA to “cause the least adverse impact possible on rural residents who depend upon subsistence uses of the resources of [the public lands in Alaska].”150 Section 810 of ANILCA contains procedural requirements that are similar to NEPA’s; pursuant to its terms, an agency proposing an action resulting in the “use, occupancy, or disposition of public lands” must evaluate that action’s effects on “subsistence uses and needs,” the availability of other lands for the same purpose, and “other alternatives” that would reduce the impacts to subsistence uses.151 Due to their similarities, courts have analyzed the procedural requirements of NEPA and ANILCA under the same standard.152
DISCUSSION
Although the parties’ briefing does not directly track the five claims set forth in Plaintiffs’ Amended Complaint, the Court addresses each claim in the Amended Complaint in the context of the applicable argument from the briefing.
I. First Claim: Impacts to Caribou and Subsistence
Plaintiffs’ first claim for relief alleges that there were “substantial questions about whether the [2018-2019] winter exploration program would have significant environmental impacts to caribou and subsistence activities.”153 They contend that it was arbitrary and capricious for BLM to issue a FONNSI and authorize the program without first completing an EIS.154 The Court will address the 2018-2019 EA’s discussion of impacts to caribou and subsistence in turn.
A. Caribou
Plaintiffs argue that the 2018 EA “include[s] no specific discussion of the effects of ConocoPhillips’ winter exploration program on caribou.”155 They contend that the EA disregards “substantial questions ... concerning the effects of winter exploration on caribou,” and that BLM was thus required to “prepare an EIS or to supply a convincing statement of reasons to explain why the effects would be insignificant.”156
The 2018 EA characterizes caribou as a “minimally impacted” species, meaning that caribou “would not be affected to a degree requiring further analysis because either the expected impacts from the proposed action and alternative would be minimal, or standard protections ... would reduce impacts.”157 Specifically, the EA states:
Caribou, grizzly bear, wolf, wolverine and small mammals ... may inhabit the area. Only minor impacts would be expected and impacts were covered in the 2012 NPRA IAP/EIS. The proposed action may disturb and displace wildlife from the immediate area of activities but would not reduce population levels or distribution during the winter season.158
Responding to Plaintiffs’ concerns about caribou impacts raised in their comments on the Preliminary EA, BLM states in the Final EA that:
Activities associated with the exploration including the construction and use of ice roads and pads could be disruptive to caribou. It would not be expected that caribou would vacate an extensive area adjacent to exploration activities during winter and would not result in changes to distribution of herds during the winter.... Although the proposed action may be disruptive to individual caribou and displace some individuals from the immediate vicinity of activities, these impacts would be local in extent, would not affect herd distribution or reduce populations.159
The 2012 IAP/EIS, to which the 2018 EA tiers, describes the Teshekpuk Caribou Herd in detail, discussing its population trends, seasonal distribution, and the significance of multiple environmental factors on calving success.160 It explains that a majority of the Teshekpuk Caribou Herd has historically “wintered on the coastal plain of the NPR-A, especially around Atqasuk and southeast of Teshekpuk Lake.”161
The 2012 IAP/EIS discussed the potential impacts of exploration activities on caribou for each of the five alternatives it considered.162 Alternative A assumed that “196 oil or gas exploratory or delineation wells would be drilled from winter ice pads over [a thirty-year period]” in the project area.163 Discussing the impacts of exploration under this alternative, the EIS states that “[e]xploratory drilling operations and ice roads would traverse Teshekpuk Caribou Herd caribou wintering areas” and that “[a]ny caribou in the immediate vicinity of the activity would be disturbed, possibly having a negative effect on their energy balance, hormonal status, and calving success, due to prolonged stress.”164 However, the EIS explained that “[b]ecause these animals are mobile and the operation would be temporary, it is not expected that there would be any long-lasting effects on caribou.”165 This analysis included a caveat: “However, this assumption has not been scientifically tested and conditions for winter survival vary year to year. It is possible that this disturbance could have an additive effect on natural winter mortality.”166
Alternative B-2—the preferred and ultimately selected alternative—altered the project area to provide additional protections for the Teshekpuk Caribou Herd; it “would add approximately 1.9 million acres to the Teshekpuk Lake Special Area ... to protect caribou calving and insect-relief areas.”167 All told, Alternative B-2 “would make approximately 11 million acres of the NPR-A unavailable for oil and gas leasing ... includ[ing] important calving and insect-relief areas for the Teshekpuk Caribou Herd.”168 However, Alternative B-2 would “make[ ] lands ... in northeastern NPR-A near Fish Creek available”;169 i.e. the area of ConocoPhillips’ 2018-2019 winter exploration activities.
Within this project area, Alternative B-2 assumed that “152 oil or gas exploratory or delineation wells, 78 percent of those assumed under Alternative A, would be drilled from winter ice pads [over a 30-year] period.”170 Discussing the impacts of exploratory drilling under Alternative B-2, the 2012 IAP/EIS explained that “[e]xploratory drilling would be conducted during the winter, when some mammal species are less active or less often present, although wintering Teshekpuk Caribou Herd caribou could be present in large numbers.”171 The EIS ultimately concluded that, under Alternative B-2, “[i]mpacts to terrestrial animals would be similar to those discussed under Alternative A, but somewhat less in spatial extent, frequency and magnitude.”172
Based on this record, Plaintiffs make several arguments about the sufficiency of the 2018 EA’s conclusion with respect to the impact on caribou. Primarily, Plaintiffs contend that several statements of uncertainty in the 2012 IAP/EIS raise “substantial questions as to whether the winter exploration may significantly affect caribou in th[e] project area.”173 They emphasize the 2012 IAP/EIS’s recognition that its assumptions regarding the impact of winter exploration have not been scientifically tested and that “it is possible that this disturbance could have an additive effect on natural winter mortality.”174 Plaintiffs also highlight the following statement, which appears in the EIS’s discussion of the impacts of the development of oil production, as opposed to exploration, under several alternatives:
Oil and gas development within the NPR-A could introduce for the first time such infrastructure and activities into the winter range of a North Slope caribou herd (Teshekpuk Caribou Herd). Previously, no North Slope caribou herd has been exposed to oil [and] gas activities year-round. The Teshekpuk Caribou Herd has experienced seismic exploration and activities near villages for many years, and some herd members on the periphery of the range have been exposed to oil field facilities in some years, but there is no evidence as yet of adverse effects other than increased hunting mortality for those animals close to villages. It is not known what population effects might occur if the majority of the herd were to have year-round contact with oil and gas facilities and activities. Despite the current lack of evidence regarding adverse impacts from seismic exploration and village contact, negative effects on caribou energy budgets during winter could result from this new situation. Such an effect could be manifested through increased winter mortality itself, or a reduction in calf productivity.175
Although these portions of the record acknowledge uncertainty about the extent of the impact that winter exploration could have on Teshekpuk Caribou Herd caribou, they do not demonstrate that the 2018 EA’s discussion of caribou was inadequate or that BLM’s decision to issue a FONNSI was arbitrary and capricious. The portions of the 2012 IAP/EIS on which Plaintiffs rely state that, as of that date, there was “no evidence ... of adverse effects” to caribou from the herd’s previous exposure to exploration activities.176 And the EIS echoes this point in its discussion of the cumulative impacts of Alternative B-2, stating: “[P]opulations of Teshekpuk Caribou Herd and Central Arctic Herd caribou have increased between the mid-1970s and 2008. Thus, disturbance of caribou due to oilfield development may adversely affect caribou populations, but these effects are not readily apparent based on population trends.”177 The evidence available to BLM when it completed the 2012 IAP/EIS therefore indicated that oil and gas exploration and development activities had not had significantly impacted NPR-A caribou, and it was reasonable to assume that future exploration activities would similarly have minimal impacts. Despite this, the EIS recognized the possibility that future studies could demonstrate otherwise.178 Uncertainty in the face of incomplete information is acceptable in an EIS, provided that the agency “candidly disclose[s] the risks and any scientific uncertainty” of the action under review.179
Moreover, the 2014 GMT1 and 2018 GMT2 SEISs, to which the 2018 EA also tiers, support the 2012 IAP/EIS’s assumption that the 2018-2019 winter exploration activities would have a minimal impact on Teshekpuk Caribou Herd caribou. In its discussion of the impacts to terrestrial mammal survival or productivity, the GMT1 SEIS notes that “[c]aribou displaced from habitats with more nutritious forage, and caribou that expend energy responding to disturbances may not be able to compensate for these energetic losses, which would potentially reduce the individual’s survival and reproduction.”180 However, it then concludes that “recent studies of calf growth and survival for caribou displaced by or exposed to oil and gas infrastructure disturbance during calving ... did not conclude significant survival or growth impacts.”181 Similarly, the GMT2 SEIS notes that the Teshekpuk Caribou Herd and the Central Arctic Herd “have undergone recent changes in size, demography, and distribution,” but that “these changes are not thought to be related to oil field development.”182
Based on this record, the 2018 EA adequately explains the basis for its conclusion that ConocoPhillips’ winter exploration program would have minimal impacts on Teshekpuk Caribou Herd caribou that “would not affect herd distribution or reduce populations.”183 The 2012 IAP/EIS adequately evaluated the effects of exploratory drilling in the area southeast of Teshekpuk Lake and concluded that impacts to caribou would be minimal based on the information then available, and this analysis was supported by the subsequent 2014 GMT1 and 2018 GMT2 SEISs. There is no indication in the record that new evidence of a significant impact on caribou has arisen that casts doubt on the continuing validity of Federal Defendants’ conclusions.184
Plaintiffs also contend that the 2012 IAP/EIS’s “general discussions cannot substitute for a specific analysis of this particular winter exploration program’s impacts in this particular place.”185 Although the 2012 IAP/EIS did not discuss the specific placement of the six exploratory wells authorized by the 2018 EA, it did anticipate significant exploration within the area to the southeast of Teshekpuk Lake, including the Fish Creek area.186 Moreover, it recognized that the Teshekpuk Caribou Herd would be present in this area during exploration activities and discussed potential impacts to the herd.187 The 2012 IAP/EIS therefore adequately considered the effect of exploratory drilling on caribou in the area to the southeast of Teshekpuk Lake, such that additional site-specific analysis was not necessary.188
By tiering to NEPA documents that fully analyze the impacts on caribou of exploration activity to the southeast of Teshekpuk Lake, the 2018 EA supplied a convincing reason for why additional analysis was not necessary. Accordingly, the Court finds that the 2018 EA’s discussion of impacts to caribou was permissible under NEPA and its implementing regulations and that it was neither arbitrary nor capricious to issue a FONNSI with respect to caribou.189
B. Subsistence Activities
Plaintiffs next argue that Federal Defendants violated NEPA by “fail[ing] to either prepare an EIS or supply a convincing statement of reasons explaining why the effects to subsistence from winter exploration will be insignificant.”190
The 2018 EA identifies subsistence activities as “potentially affected” by ConocoPhillips’ winter exploration, explaining that:
Large game (subsistence resources) would likely be deflected from areas of exploration activity. Caribou hunting is lowest during winter, therefore the deflection of furbearers and potential overlap with trapping areas would be the most likely impact.... The area is on the edge of the high use area for furbearer hunting and trapping. However, ice roads may facilitate hunter access to areas otherwise only accessible via snowmachine. Impacts to subsistence use from this project in and of itself would be expected to be minor to moderate and short term (reduced traditional access and reduced availability of resources, primarily affecting families for whom furbearer harvesting is important) .... Harvest levels have remained stable to date, and no reduction in the overall abundance of subsistence resources would be anticipated.191
A separate section of the EA discussing the direct and indirect impacts of the winter exploration program on subsistence activities expands on this analysis.192 It explains that the “project area is traditionally used for winter furbearer hunting and trapping and limited caribou hunting.”193 The EA tiers to the 2012 IAP/EIS, the GMT1 SEIS, and the GMT2 SEIS for a discussion of the potential impacts to these resources, and provides only a “brief[ ] summar[y] and analy[sis]” itself.194
The 2018 EA’s subsistence impact section begins with a discussion of furbearers:
The most likely direct impact would be experienced by furbearer hunters and trappers because the area is used by all Nuiqsut furbearer hunters and trappers and was, until recent development, one of the few remaining areas near town where people could hunt and trap without nearby infrastructure and industrial activity.195
The EA explains that “[a]lthough wolf and wolverine harvests do not contribute to the subsistence diet and it is primarily young men who participate in the activity, it is a critical component of the seasonal round of subsistence activities for Nuiqsut,” and that “[f]or these reasons, impacts to furbearer harvesting could have an outsized sociocultural impact for those families in Nuiqsut that depend on it.”196
Turning to caribou, the 2018 EA explains that “[t]he proposed activity would also encompass a large area around Fish Creek, which is an important area for wintertime caribou hunting because it is one of the rare areas on the [Arctic Coastal Plain] where caribou can be found throughout the year.”197 For this reason, “Nuiqsut residents place extreme value on the Fish Creek area because it has been understood as an area that provides food security.”198 But the EA notes that “[c]aribou harvest levels in the area have been low in recent years, and it is possible that more hunters will access the area to attempt harvests via the exploration ice roads.”199
For both caribou and furbearers, the 2018 EA explains that “[s]ubsistence hunters would likely avoid the area either because they believe that resources will not be there or because they prefer not to hunt and trap around exploration activities.”200 It recognizes that “[b]eing required to travel further to conduct [subsistence] activities [in winter] increases the risk, time, and costs involved.”201 The EA notes, though, that “[s]ome hunters who are not disturbed by industrial activities or who are less able to travel and hunt elsewhere ... may take advantage of the ice roads to travel.”202
Plaintiffs maintain that the analysis in the 2018 EA raises “substantial questions as to whether the winter exploration program may significantly affect subsistence activities in this project area.”203 They contend that the issuance of a FONNSI was improper because none of the tiered-to EISs “specifically analyze[ ] the effects of winter exploration in this project area,” such that preparation of a separate EIS was necessary.204 Defendants maintain that the record supports the EA’s conclusion and that the decision to issue a FONNSI for the 2018-2019 winter exploration program was neither arbitrary nor capricious.205
The 2018 GMT2 SEIS and the 2012 IAP/EIS each contain a detailed description of Nuiqsut subsistence activities.206 These analyses generally support the 2018 EA’s description of subsistence uses in the project area. For instance, the GMT2 SEIS explained that “[d]uring the winter months, furbearer hunters pursue wolves (amaģuq) and wolverines (qavvik), [and] target caribou ... as needed and available,” but that “[o]verall, Nuiqsut harvesters target the highest numbers of resources during the summer/fall months of August and September.”207 The GMT2 SEIS noted that a long-term project monitoring Nuiqsut caribou harvesting “has documented a general increase in the percentage of harvests in the area west of Nuiqsut,” an area that includes the location of the 2018-2019 winter exploration.208 Discussing the specific area at issue in this case, the GMT2 SEIS stated that “[s]ome members of the [Teshekpuk Caribou Herd] remain on the coastal plain through winter, which contributes to Nuiqsut hunters’ understanding that caribou can usually be found west of the [GMT2] Project area in the vicinity of Fish Creek.”209
Turning to impacts, the NEPA documents to which the 2018 EA tiers discussed at length game deflection by, and hunter avoidance of, industrial activity. The 2012 IAP/EIS stated that direct impacts “from an exploratory drilling operation” would include “displacement of resources away from the drill site,” and that “subsistence hunters report that [exploration] activity displaces game, especially caribou, wolves, and wolverine.”210 And the GMT2 SEIS reported that “[s]ubsistence harvesters often avoid areas of industrial construction due to discomfort about hunting near human or industrial activity.”211 The GMT2 SEIS explained that “[s]ome hunters are able to afford and are willing to respond to impacts [of development] by traveling farther or taking more trips,” but recognized that “[o]ther harvesters may not be able to afford or may not be willing to take more or more distant hunting trips”212 It also noted that “[s]ome hunters are less likely to bring younger family members along if they anticipate longer and/or riskier trips.”213 And the 2012 IAP/EIS explained that having to travel further to hunt and trap “affects subsistence users in the following ways: loss of subsistence food; loss of time; loss of money; increased stress and anxiety; increased risk of equipment failure; and increased risk of loss of life or serious bodily injury.”214 That said, the GMT2 SEIS’s ANILCA evaluation explained that “ice roads, where and when access is permitted and feasible, facilitate access to remote areas that some subsistence hunters appreciate and can be considered a countervailing effect.”215
The GMT2 SEIS reported that Nuiqsut’s per capita caribou harvest has remained generally stable as development has intensified around the village, and that “[m]ost hunters have continued to harvest caribou in desired amounts” while avoiding industry.216 It recognized, though, that “as industry has moved closer to Nuiqsut, it has become more difficult for residents to avoid industry” and that “[a]voidance may be less of an option as fewer areas without development are present.”217
The GMT2 SEIS also considered the sociocultural impacts of reduced access to traditional hunting grounds and decreased subsistence opportunities: “When subsistence users’ opportunities to engage in traditional activities are limited, transmittal of knowledge about those activities is reduced. If residents decrease use of the [GMT2] project area, the opportunity to transmit traditional knowledge about the area would diminish and could eventually be lost to younger generations.”218 It recognized that:
If harvests or the number of active participants in harvesting declines, younger generations would have fewer opportunities to learn the skills necessary to hunt, harvest, and process subsistence resources. Fewer opportunities to participate in the sharing and consumption of traditional Inupiaq food would affect the social cohesion of the community. Any changes to residents’ ability to participate in subsistence activities, to harvest resources in traditional places at the appropriate times, and to eat traditional Inupiaq foods could have long-term or permanent effects on culture by diminishing social ties within the community that are strengthened through harvesting, processing, and sharing.219
The GMT2 SEIS recognized “[t]he high level of concern that Nuiqsut residents place on future generations’ ability to maintain traditional subsistence.”220
Finally, Plaintiffs’ arguments notwithstanding, the 2012 IAP/EIS and 2018 GMT2 SEIS anticipated that these impacts would occur in the area of ConocoPhillips’ 2018-2019 winter exploration. As noted above, in the portion of this decision addressing the impacts to caribou, the 2012 IAP/EIS’s preferred alternative authorized significant exploration within the area to the southeast of Teshekpuk Lake, including the Fish Creek area.221 And while the project area studied in the GMT2 SEIS does not include the area of ConocoPhillips’ winter exploration, it is directly adjacent to it.222 The GMT2 “SEIS also analyze[d] indirect impacts to the larger Nuiqsut subsistence us area,” including Judy and Fish creeks, such as “hunter avoidance of infrastructure, the potential for localized deflection of caribou, wolves, and wolverines, disturbance from aircraft and ground traffic, and community participation.”223 The GMT2 SEIS’s cumulative impacts section identified the expected development of the Willow project, and explained that exploratory drilling would likely occur over the winter of 2018-2019.224 It recognized that full development of the Willow area, “in combination with development of GMT2, [is] likely to increase problems between subsistence users and oil and gas activities,” and “will most likely pose difficulties for those hunters who prefer to avoid oil and gas infrastructure altogether.”225
On this record, the Court is satisfied that the 2018 EA took the requisite hard look at the proposed action’s impacts to subsistence activities. The 2012 IAP/EIS and 2018 GMT2 SEIS each contain discussion of subsistence use by Nuiqsut residents of the 2018-2019 winter exploration area. The record shows that winter use of the area, although highly valued, is low relative to summer use, and that Nuiqsut harvests, especially of caribou, have remained steady despite increased development around the village. And the record supports the EA’s conclusion that while many hunters may avoid the area of ConocoPhillips’ winter exploration, some may use the project’s ice roads to gain increased access to overwintering caribou.
It was thus reasonable for the EA to determine that subsistence impacts associated with one season’s winter exploration would be moderate and short-term.226 Moreover, the GMT2 SEIS and 2012 IAP/EIS considered at length the impacts associated with hunter avoidance and reduced access to traditional hunting areas, which the EA identified as potential consequences of the 2018-2019 winter exploration program. By tiering to these documents, which fully analyzed the issue, the 2018 EA provided a convincing reason for why further analysis of impacts to subsistence uses was not necessary. The Court therefore finds that the issuance of a FONNSI with respect to subsistence uses was neither arbitrary nor capricious.227
II. Second Claim: Cumulative Impacts
Plaintiffs’ second claim for relief alleges that the 2018 EA “provides no convincing justification for concluding that cumulative impacts to caribou and subsistence activities” from the winter exploration and concurrent projects in the area “will be insignificant.”228 They contend, therefore, that the issuance of a FONNSI was arbitrary and capricious and a violation of NEPA.229
“ ‘NEPA requires an agency to consider’ cumulative effects, which ‘result[ ] from the incremental impact of the action when added to other past, present and reasonably foreseeable actions....’ ”230 “An EA’s analysis of cumulative impacts ‘must give a sufficiently detailed catalogue of past, present, and future projects, and provide adequate analysis about how these projects, and differences between the projects, are thought to have impacted the environment.’ ”231 “General statements about ‘possible effects’ and ‘some risk’ do not constitute a ‘hard look’ absent a justification regarding why more definitive information could not be provided.”232 To prevail on a claim that an EA should have analyzed the cumulative impacts of a certain project, a plaintiff “must show only the potential for cumulative impact.”233
The 2018 EA contains a section discussing cumulative impacts, which identifies all of the projects slated to occur in the winter exploration project area, including geotechnical exploration and GMT2 development.234 It notes that “exploration and construction in the area have occurred at the same time in previous years,” but that “[t]he cumulative scenario for winter 2018-2019 is likely more intense and extensive than previous winter seasons, or will likely be perceived as such by residents.”235 Similar to the EA’s discussion of caribou and subsistence impacts, the cumulative impacts section “tiers to the most recent cumulative impact analysis in” the 2012 IAP/EIS, the 2014 GMT1 SEIS, and the 2018 GMT2 SEIS.236
The 2018 EA provides a more detailed discussion of cumulative impacts to the two issue areas that its scoping process had identified as potentially impacted by the proposed action: “subsistence, sociocultural systems, and environmental justice” and “fish and water resources.”237 Its introduction concludes that “[n]either the Proposed Action nor the No-Action Alternative would add substantially to the incremental past, present, and future impacts described below.”238 Regarding subsistence, the EA concludes that likely cumulative impacts “include hunter disturbance and avoidance and reduced local availability of resources.”239 The EA does not specifically address the cumulative impacts to caribou.
Plaintiffs contend that “[i]mpacts to caribou and subsistence activities from ConocoPhillips’ [geotechnical] exploration and GMT2 construction projects will undeniably cumulate with the impacts from winter exploration,” and that the EA does not contain a meaningful discussion of these cumulative impacts.240 Defendants maintain that the EA and the NEPA documents to which it tiers adequately considered the cumulative impacts of ConocoPhillips’ 2018-2019 winter exploration, and that the issuance of a FONNSI was appropriate.241
Plaintiffs first argue that the 2018 EA “failed to provide any meaningful analysis of the cumulative impacts from the [geotechnical] exploration program and winter exploration on caribou.”242 Although the EA does not contain a discrete section analyzing the cumulative impacts on caribou, the 2012 IAP/EIS and the 2018 GMT2 SEIS, to which it tiers, discuss the issue in detail.243 Neither document identifies geotechnical exploration specifically; however, the geotechnical exploration EA prepared by BLM in February 2019 shows that the anticipated impacts of that activity are similar in kind to those of exploratory drilling.244 For this reason, the Court is satisfied that discussion of the anticipated cumulative impacts of exploratory drilling adequately captured the impacts of geotechnical exploration as well. Moreover, the geotechnical exploration is a component of the broader Willow development process, which both the GMT2 SEIS anticipated and discussed in detail.245
The 2012 IAP/EIS recognized that “[f]uture leases in the NPR-A could expose a large number of the Teshekpuk Caribou Herd caribou to exploration and development activities on their summer and winter grounds, and during migration.”246 It explained that “[l]oss of habitat and disturbance (including noise) are the two primary factors associated with seismic activities and exploration drilling that could affect mammals on the North Slope.”247 The 2012 IAP/EIS reported that “it has been assumed that these effects [of prior exploration on Teshekpuk Caribou Herd caribou] did not persist after exploration was completed, and there was no consequential effect on the abundance or productivity of the caribou.”248 It recognized, however, that “[i]t is not known what population effects might occur if the majority of the [Teshekpuk Caribou] herd were to have year-round contact with oil and gas facilities and activities.”249 It concluded that “[d]espite the current lack of evidence regarding adverse effects from seismic exploration and village contact, negative effects on caribou energy budgets during winter could result from this new situation.”250
The 2018 GMT2 SEIS identified ConocoPhillips’ 2018-2019 winter exploration as a foreseeable future action.251 Addressing caribou generally, the SEIS explained that “disturbance of caribou due to oil field development may adversely affect caribou populations, but these impacts are not readily apparent based on population trends.”252 The SEIS also addressed the cumulation of development and exploration specifically, stating that “[t]he loss of habitats resulting from the development of GMT2 and reasonably foreseeable future exploration and development activities would affect primarily the [Teshekpuk Caribou Herd] whose range is west of the Colville river.”253 The GMT2 SEIS concluded:
Overall, industry and agency actions on the North Slope are expected to have minor impacts to caribou herd productivity. Determining the overall cumulative impacts on herd abundance is difficult to predict. Displacement of caribou from the periphery of core calving area would be expected but this impact may have only a minor effect on the [Teshekpuk Caribou Herd] population.254
As with their arguments relating to the sufficiency of the 2018 EA’s discussion of direct and indirect impacts to caribou, Plaintiffs contend that these statements raise questions that “demonstrate the need for detailed information at” the site-specific planning phase.255 They argue that the “admittedly speculative accounts” in the tiered-to EISs “cannot make up for fatal deficiencies in the winter exploration EA.”256 However, as previously noted, NEPA allows for uncertainty, so long as the agency provides “a justification regarding why more definitive information could not be provided.”257
The GMT2 SEIS and the 2012 IAP/EIS adequately explained the difficulty in predicting the effect that extended contact with oil and gas activities will have on the Teshekpuk Caribou Herd because no North Slope herd has previously been in that situation; there is no data because it is a novel situation. In the face of this uncertainty, along with the uncertainty caused by variable winter conditions year to year,258 the planning documents to which the 2018 EA tiers described the foreseeable future projects occurring in the area to the west of Nuiqsut and made reasonable assumptions about their cumulative impact to caribou based on the data available. This is not the sort of “vague discussion” of cumulative impacts that the Ninth Circuit has held to be improper in other cases.259 The Court therefore finds that the issuance of a FONNSI with respect to the winter exploration’s cumulative impacts to caribou was neither arbitrary nor capricious.
Plaintiffs do not articulate how the 2018 EA’s discussion of cumulative impacts to subsistence activities is deficient, other than to state that “impacts to caribou and impacts to subsistence activities are necessarily intertwined.”260 As discussed above, the GMT2 SEIS and 2012 IAP/EIS, to which the EA tiers, adequately discussed the cumulative impacts to caribou caused by concurrent development and exploratory drilling to the west of Nuiqsut. Moreover, the EA’s conclusion that cumulative impacts from ConocoPhillips’ winter exploration would “include hunter disturbance and avoidance and the reduced local availability of resources”261 is well supported by the record.
The GMT2 SEIS contained a detailed discussion of the expected cumulative impacts to subsistence caused by “oil and gas exploration and development activities.”262 This section of the SEIS identified ConocoPhillips’ 2018-2019 winter exploration as a foreseeable future project.263 It noted that “[r]ecently leased acreage within and near the NPR-A indicates the likely future progression of oil exploration and development on the western and southern sides of Nuiqsut.”264 The GMT2 SEIS stated that “[t]hese activities, in combination with development of GMT2, are likely to increase problems between subsistence users and oil and gas activities,” adversely impacting “hunters who prefer to avoid oil and gas infrastructure altogether” and contributing to a loss of caribou habitat.265 The section concluded that “the GMT2 Project in addition to other current and reasonably foreseeable activities could increase the severity of existing impacts on Nuiqsut subsistence uses” and that “[t]hese impacts include continued hunter avoidance of industrial areas, continued disturbance of hunters and wildlife from increased air and road traffic, reduced access to or loss of subsistence use areas, and reduced availability of subsistence resources in development areas.”266
This record demonstrates that the 2018 EA took the requisite hard look at cumulative impacts to caribou and subsistence activities in the project area. And by tiering to previous EISs that fully analyze these issues, the 2018 EA provides a convincing justification for why further discussion of cumulative impacts is unnecessary. The issuance of a FONNSI with respect to the cumulative impacts to caribou and subsistence activities was therefore neither arbitrary nor capricious.267
III. Fourth Claim: Consideration of Alternatives Under NEPA
The Amended Complaint’s fourth claim for relief argues that Federal Defendants “failed to consider appropriate alternatives” in the 2018 EA.268 Plaintiffs contend that this violated NEPA, which requires an agency to “study, develop, and describe appropriate alternatives to recommended courses of action.”269
“Although an agency must still ‘give full and meaningful consideration to all reasonable alternatives’ in an [EA], the agency’s obligation to discuss alternatives is less than in an EIS.”270 “[W]ith an EA, an agency only is required to include a brief discussion of reasonable alternatives.”271 An agency need not “consider every possible alternative to a proposed action, nor must it consider alternatives that are unlikely to be implemented or those inconsistent with its basic policy objectives.”272 “NEPA does not require a separate analysis of alternatives which are not significantly distinguishable from alternatives actually considered, or which have substantially similar consequences.”273
The 2018 EA only considers two alternatives in detail: the preferred alternative and a no-action alternative.274 This by itself does not render the EA deficient; “[t]he statutory and regulatory requirements that an agency must consider ‘appropriate’ and ‘reasonable’ alternatives does not dictate the minimum number of alternatives that an agency must consider,”275 and consideration in an EA of only the preferred alternative and a no-action alternative can be sufficient under NEPA.276 However, “[t]he existence of a viable but unexamined alternative renders an [EA] inadequate.”277
In their comments on the Preliminary EA, Plaintiffs stated that “[t]wo reasonable alternatives BLM has failed to consider are: (1) allowing fewer wells; and (2) requiring [ConocoPhillips] to comply with all BMPs” from the 2012 IAP/EIS.278 Plaintiffs contend that Federal Defendants’ failure to consider each of these alternatives in detail renders the EA inadequate.279 Whether an alternative is reasonable and appropriate depends on the stated purpose for the proposed action.280 “So long as ‘all reasonable alternatives’ have been considered and an appropriate explanation is provided as to why an alternative was eliminated, the regulatory requirement is satisfied.”281
The 2018 EA identifies the need for the proposed action as follows: “The project is needed to provide detailed information regarding potential reserves of oil and gas within the NPR-A.”282 It explains that the “purpose for the proposed action is for BLM to provide reasonable access to and use of public lands within the NPR-A in a manner that would allow the applicant to explore and appraise oil and gas potential on NPR-A leases operated by [ConocoPhillips].”283
The 2018 EA explained that it had considered but eliminated from detailed analysis an alternative that would reduce the number of wells approved for drilling.284 It states that “[t]he proposed action itself ... significantly limits alternatives for the location and timing of exploration,” and that “[l]ocations of leases with oil and gas prospects limit the options for feasible drill site locations and access routes.”285 Specifically, the EA explains that ConocoPhillips had an obligation to “continue drilling to delineate the resource and an associated future participating area” on its leases, and noted that a fewer-wells alternative “would be contrary to the terms of [ConocoPhillips’] leases, which allow[ ] the company to have a drilling program on its leases after going through the review process for particular wells.”286 The 2018 EA concludes that an alternative with fewer wells “would not meet the purpose and need” of the proposed action.287
The Court finds that the EA gives an “appropriate explanation” for eliminating an alternative that would authorize fewer wells.288 The record generally supports Plaintiffs’ assertion that authorizing fewer exploratory wells would likely reduce the impacts of ConocoPhillips’ winter exploration, resulting in fewer miles of ice roads and a generally smaller footprint.289 And Plaintiffs are correct that BLM has the authority to place limitations on the extent of lease-holder’s exploratory drilling during a given season.290 However, the fact that BLM had the authority to limit the number of wells does not mean that doing so would serve the purpose and need of the project. The stated purpose of the proposed action in the 2018 EA was to “allow the applicant to explore and appraise oil and gas potential on [its] NPR-A leases.”291 That section of the EA further explains that the winter exploration program was “composed of several elements ... designed to meet the applicant’s needs and objectives,” including “[d]rilling up to six exploratory wells to acquire sufficient subsurface information to satisfy the applicant’s economic and exploration performance criteria.”292 With ConocoPhillips having apparently concluded that up to six additional exploration wells were necessary to obtain sufficient information about the area’s development potential, it was reasonable for the 2018 EA to eliminate an alternative authorizing fewer wells as inconsistent with the proposed action’s purpose and need.293
Plaintiffs also maintain that the 2018 EA is deficient because it does not consider an alternative that would have required ConocoPhillips to comply with all of the 2012 IAP/EIS’s BMPs.294 ConocoPhillips requested deviations from three of the 2012 IAP/EIS’s BMPs: BMP B-2g, which prohibits “[c]ompaction of snow cover or snow removal from fish-bearing waterbodies,” except in approved locations, in order to maintain fish populations and habitat;295 BMP B-2d, which limits the amount of “unfrozen water and ice” that may be removed from lakes, in order to maintain fish populations and habitat;296 and BMP A-5, which prohibits refueling “within 500 feet of [an] active floodplain” and generally requires “[f]uel storage stations ... [to] be located at least 500 feet from any water body,” in order to “[m]inimize the impacts of contaminants ... on fish, wildlife, and the environment.”297 The EA grants each of these deviation requests after determining that they would not compromise the objectives of the BMPs.298 It explains that each deviation contains mitigation measures to promote the purpose of the BMP in question, or that recent data shows that the deviation will not result in adverse impacts.299
The 2018 EA concludes that deviation from BMPs B-2g, B-2d, and A-5 would not result in additional adverse impacts and explained its reasoning.300 An alternative requiring compliance with these BMPs would therefore have substantially similar consequences to the EA’s preferred alternative. Under these circumstances, it was neither arbitrary nor capricious for the agency to exclude this alternative from consideration.301
The Court is therefore satisfied that the 2018 EA considered a proper range of alternatives. Under Ninth Circuit precedent, an EA considering only a preferred alternative and a no-action alternative can satisfy an agency’s duty under NEPA.302 And unlike the cases on which Plaintiffs rely, two of which are unreported, the two alternatives considered in 2018 EA would authorize meaningfully different levels of activity.303 Finally, as discussed above, BLM’s decision not to consider the two alternatives proposed by Plaintiffs was appropriate.
IV. Fifth Claim: Consideration of Alternatives Under ANILCA
The fifth claim for relief in the Amended Complaint is that Federal Defendants “failed to consider alternatives that would reduce or eliminate the use of lands needed for subsistence purposes” in violation of ANILCA.304 Section 810(a) of ANILCA provides that:
In determining whether to withdraw, reserve, lease, or otherwise permit the use, occupancy, or disposition of public lands under any provision of law authorizing such actions, the head of the Federal agency having primary jurisdiction over such lands or his designee shall evaluate the effect of such use, occupancy or disposition on subsistence uses and needs, the availability of other lands for the purposes sought to be achieved, and other alternatives which would reduce or eliminate the use, occupancy, or disposition of public lands needed for subsistence purposes.305
The 2018 EA includes a separate ANILCA § 810 evaluation.306 The evaluation describes the winter exploration program and evaluates its “[e]ffect ... on subsistence uses and needs.”307 It finds that ConocoPhillips’ winter exploration would “not significantly reduce harvestable fisheries resources” or “significantly reduce the abundance of harvestable wildlife resources.”308 The evaluation determines that “no other lands are appropriate for this specific purpose” due to the nature of ConocoPhillips’ leases.309 Finally, it discusses the no-action alternative, explaining that it was “contrary to the current Administration’s policy and [ConocoPhillips’] lease rights.”310 The evaluation ultimately concludes that:
The direct and indirect effects of the proposed action are not anticipated to significantly restrict subsistence uses. The proposed action is anticipated to result in minor to moderate, short-term impacts to subsistence uses, primarily associated with restrictions on hunter access and reduced availability of subsistence resources in areas where they are traditionally harvested.311
As with their NEPA claim, Plaintiffs contend that this evaluation is deficient, and that ANILCA § 810(a) required the 2018 EA to either consider a fewer-wells alternative and an alternative with no deviations from the 2012 IAP/EIS BMPs or provide an adequate explanation for not doing so.312 Courts generally evaluate the procedural requirements of ANILCA and NEPA under the same standard.313
At the outset, Federal Defendants argue that consideration of Plaintiffs’ proposed alternatives is not mandated by ANILCA § 810(a). They contend that ANILCA only requires the consideration of alternatives that would reduce the total amount of land needed for a given action.314 The Court finds this argument unconvincing. The plain language of § 810(a) requires agencies to consider alternatives that would “reduce or eliminate the use, occupancy, or disposition of public lands needed for subsistence purposes;”315 an alternative could restrict the ability to use an area for subsistence purposes without reducing that area’s size.
Federal Defendants rely on the Ninth Circuit’s statement in Kunaknana v. Clark that § 810(a) requires an agency to consider “other alternatives which would reduce or eliminate the amount of land taken away from subsistence uses.”316 But the Circuit there applied the language of § 810(a) to the particular facts of the case, which concerned BLM’s decision to offer certain tracts in the NPR-A for oil and gas leasing.317 Since Kunaknana, the Ninth Circuit has considered alternatives that reduce the scope or intensity of an activity within a given area to fall within § 810(a)’s meaning.318 Moreover, even if Federal Defendants were correct on this point, Plaintiffs’ proposed alternatives would have reduced the footprint of the 2018-2019 winter exploration by authorizing fewer wells or prohibiting the use of certain areas for infrastructure by denying ConocoPhillips’ BMP deviation requests.319 Plaintiffs’ proposed alternatives therefore fell within the scope of ANILCA § 810(a).
Nevertheless, the Court is satisfied that BLM fulfilled its obligation under that provision to evaluate “alternatives which would reduce or eliminate the use, occupancy, or disposition of public lands needed for subsistence purposes.”320 As noted above, this section is analogous to NEPA’s mandate to consider reasonable and appropriate alternatives, and “NEPA case law is helpful in interpreting § 810.”321 As explained in the previous section of this decision, the 2018 EA’s consideration of only the preferred alternative and a no-action alternative was permissible under NEPA, and Federal Defendants’ decision to eliminate Plaintiffs’ proposed alternatives from consideration was neither arbitrary nor capricious.322 For the same reasons, the Court finds that the EA complied with ANILCA § 810(a).
ORDER
In light of the foregoing, it is hereby ORDERED that:
Plaintiffs Center for Biological Diversity and Friends of the Earth are DISMISSED for lack of standing.
The 2018 EA and the ROD authorizing ConocoPhillips’ 2018-2019 winter exploration in the NPR-A are UPHELD. Plaintiffs’ requests at Docket 27 for declaratory relief and vacatur of the 2018 EA and the ROD are therefore DENIED.
Plaintiffs’ Motion to Take Judicial Notice of Supplemental Factual Materials at Docket 44 is GRANTED.
The Clerk of Court is directed to enter a final judgment accordingly.
All Citations
Slip Copy, 2020 WL 113495, 432 F.Supp.3d 1003
For full citations, please contact the library.