38 F.Supp.3d 1073

United States District Court,

D. Arizona.

GRAND CANYON TRUST, et al., Plaintiffs,

v.

Michael WILLIAMS, et al., Defendants.

No. CV-13-08045-PCT-DGC.

Signed Aug. 7, 2014.

*1074 Marc D. Fink, Duluth, MN, Neil Levine, Grand Canyon Trust, Denver, CO,
Richard Warren Hughes, Rothstein Donatelli Hughes Dahlstrom Schoenburg Bienvenu
LLP, Santa Fe, NM, Roger Flynn, Western Mining Action Project, Lyons, CO, for
Plaintiffs.

Beverly F. Li, U.S. Dept of Justice, Washington, DC, for Defendants.

ORDER

DAVID G. CAMPBELL, District Judge.

Defendants have filed a partial motion to dismiss. Doc. 71. The motion is
fully *1075 briefed (Docs. 118, 120, 123), and the Court heard oral argument on
August 1, 2014. For the reasons stated below, the Court will deny the motion.

I. Background.

This case arises out of renewed operations of the Canyon Uranium Mine ("Canyon
Mine"). The Canyon Mine is located six miles south of Grand Canyon National Park
in the Kaibab National Forest, and four miles north of Red Butte, a religiously
significant site for Plaintiff Havasupai Tribe. Doc. 115, PP 2, 49.

In 1984, Energy Fuels Nuclear ("EFN") proposed to develop two unpatented mining
claims in the area. Id., P 29. In 1986, the Forest Service, after preparing an
Environmental Impact Statement ("EIS"), issued a Record of Decision ("ROD")
approving a Plan of Operations for the mine. Id., P 30. Several administrative
appeals were filed, and the Deputy Regional Forester and Chief of the Forest
Service each affirmed the ROD after a full review of the record. In 1988, the
Havasupai Tribe challenged the Forest Service's approval of the Canyon Mine in
this Court. Id., P 35. The Court found in favor of the Forest Service on all
claims, Havasupai Tribe v. United States, 752 F.Supp. 1471 (D.Ariz.1990), and the
Ninth Circuit affirmed, Havasupai Tribe v. Robertson, 943 F.2d 32 (9th Cir.1991).
Surface structures were built and the mine shaft was constructed to a depth of 50
feet, but EFN placed the mine on standby status when uranium prices dropped in
1992. Doc. 115, P 37.

The Federal Land Policy and Management Act ("FLPMA") authorizes the Secretary
of the Interior to withdraw public lands from mining operations. 43 U.S.C. s
1714(a). On July 21, 2009, the Secretary published notice of his intent "to
withdraw approximately 633,547 acres of public lands and 360,002 acres of National
Forest System lands for up to 20 years from location and entry under the Mining
Law of 1872." Notice of Proposed Withdrawal, 74 Fed.Reg. 35,887. Over the next
two years, the Department of Interior ("DOI") undertook extensive study and
preparation of an EIS and ROD to finalize a permanent withdrawal in the area. In
2010, the U.S. Geological Survey issued an evaluation of the uranium mining
impacts in the proposed withdrawal area. Doc. 115, P 48.

In September 2011, Energy Fuels Resources Inc. ("Energy Fuels"), which had
acquired the Canyon Mine from EFN, informed the Forest Service that it intended to
reopen the mine under the original Plan of Operations.FN1 Id., P 50. In January
2012, DOI withdrew more than 1,000,000 acres from mineral location and entry for
20 years, subject to valid existing mineral rights ("the Withdrawal"). Id., P
54. Land covered by the Withdrawal included the Canyon Mine. One month after the
Withdrawal, the Forest Service completed an evaluation and concluded that valid
existing mineral rights ("VERs") existed for the two claims at Canyon Mine as of
the date of the Withdrawal (the "VER Determination"). Id., P 58. In June 2012,
the Forest Service concluded that neither a modification of the 1986 Plan of
Operations nor a supplemental EIS under NEPA were required for the Canyon Mine to
resume operations. Id., P 62.

FN1. For a time, the mine owner was known as Dennison Mines. For ease of
reference, the Court will simply refer to the mine owner after 2011 as
"Energy Fuels."

Plaintiffs brought suit in March 2013, challenging the government's approval of
renewed operations at Canyon Mine. Doc. 1. On June 13, 2013, Defendants moved to
dismiss Plaintiffs' claims for lack of subject matter jurisdiction and also sought
dismissal of certain claims on the basis of res *1076 judicata and the statute of
limitations. Doc. 71. Plaintiffs moved to stay consideration of the motion to
allow discovery on jurisdictional defenses. The Court granted the motion to stay
and allowed Plaintiffs a "reasonable but limited opportunity to develop additional
facts to support their jurisdictional arguments." Doc. 85. Discovery and
briefing on the jurisdictional issues was completed on May 19, 2014.

II. Legal Standard.

A motion to dismiss under Rule 12(b)(1) for lack of subject matter jurisdiction
"may be facial or factual. In a facial attack, the challenger asserts that the
allegations contained in a complaint are insufficient on their face to invoke
federal jurisdiction. By contrast, in a factual attack, the challenger disputes
the truth of the allegations that, by themselves, would otherwise invoke federal
jurisdiction." Safe Air for Everyone v. Meyer, 373 F.3d 1035, 1039 (9th Cir.2004)
(citing White v. Lee, 227 F.3d 1214, 1242 (9th Cir.2000)) (citation omitted).

Defendants' motion has become a factual attack on jurisdiction. In resolving
such an attack, the Court "may review evidence beyond the complaint without
converting the motion to dismiss to a motion for summary judgment." Safe Air for
Everyone, 373 F.3d at 1039; see also Augustine v. United States, 704 F.2d 1074,
1077 (9th Cir.1983). The Court may not resolve genuine factual disputes if
jurisdictional and substantive issues are intertwined. See Augustine, 704 F.2d
at 1077; Roberts v. Corrothers, 812 F.2d 1173, 1177 (9th Cir.1987). Instead,
the Court must find that jurisdiction exists and address the motion to dismiss as
a motion for summary judgment attacking the merits of Plaintiff's case. See Safe
Air for Everyone, 373 F.3d at 1039-40, n. 3. The Court need not presume the
truthfulness of Plaintiff's allegations. Id. at 1039 (citing Savage v. Glendale
Union High Sch., 343 F.3d 1036, 1039 n. 2 (9th Cir.2003), White, 227 F.3d at
1242). Plaintiffs have the burden of establishing subject matter jurisdiction.
Safe Air for Everyone, 373 F.3d at 1039.

III. Analysis.

Plaintiffs' claims are brought under the Administrative Procedures Act ("APA").
Defendants argue that some of the claims should be dismissed because they do not
challenge a "final agency action" as required by s 704 of the APA. 5 U.S.C. s 704.
This includes Plaintiffs' assertion in Claim 1 of the amended complaint that a
supplemental EIS should have been performed under NEPA before the VER
Determination issued, their assertion in Claim 2 that Defendants failed to comply
with s 106 of the National Historic Preservation Act ("NHPA") before completing
the VER Determination, and their assertion in Claim 4 that the VER Determination
was arbitrary because the Forest Service ignored relevant economic factors. Doc.
115.FN2

FN2. Defendants' motion to dismiss, which was filed before the amended
complaint, challenged Claims 1, 2, 3, 4, 6, 7, and 8 of the original
complaint. On April 4, 2014, Plaintiffs filed an amended complaint and
reduced their claims from eight to four. Doc. 115. The motion to dismiss
applies to Claims 1, 2, and 4 of the amended complaint.

A. Claims 1 and 4.

[1] Because judicial review under the APA applies only to final agency actions,
5 U.S.C. s 704, the Court must decide whether the VER Determination is a final
agency action. There are two components to this inquiry. First, the Court must
decide whether the VER Determination is an "agency action" within the meaning of
the APA. An agency action "includes the *1077 whole or a part of an agency rule,
order, license, sanction, relief, or the equivalent or denial thereof, or failure
to act." 5 U.S.C. s 551(13). Second, if the VER Determination is an agency
action, the Court must decide whether it is a final agency action. To be
considered a final agency action under the APA, the two prongs of the test
established in Bennett v. Spear, 520 U.S. 154, 117 S.Ct. 1154, 137 L.Ed.2d 281
(1997), must be satisfied. "First, the action must mark the 'consummation' of the
agency's decisionmaking process-it must not be of a merely tentative or
interlocutory nature. Second, the action must be one by which rights or
obligations have been determined, or from which legal consequences will flow."
Id. (citing Chicago & S. Air Lines, Inc. v. Waterman S.S. Corp., 333 U.S. 103,
113, 68 S.Ct. 431, 92 L.Ed. 568 (1948); Port of Boston Marine Terminal Ass'n. v.
Rederiaktiebolaget Transatlantic, 400 U.S. 62, 71, 91 S.Ct. 203, 27 L.Ed.2d 203
(1970) (internal quotes omitted)). The Court will address these requirements in
turn.

1. Agency Action.

[2] Plaintiffs argue that the VER Determination is an agency action because it
is both a "license" and a "relief" within the statutory definition of "agency
action" in the APA. 5 U.S.C. s 551. They argue that it was legally required
under the FLPMA before Canyon Mine could restart in the Withdrawal area. Doc.
126 at 18-19. Although Defendants' position was not entirely clear in their
briefing, counsel for the government agreed at oral argument that the VER
Determination is an agency action.

The Court also agrees. The VER Determination constituted the Forest Service's
conclusion that Energy Fuels had valid existing mineral rights at the Canyon Mine
site. This action falls squarely within the APA definition of agency action as
including "the whole or a part" of any agency "relief." 5 U.S.C. s 551(13).
"Relief," in turn, is defined as "recognition" of a "claim" or "right." s
551(11)(B). The VER Determination constituted the Forest Service's recognition of
valid mineral rights and of a valid claim to such rights at the Canyon Mine. The
determination falls within the definition of relief, and therefore within the
definition of agency action.

2. Bennett Part 1: Consummation.

[3] Plaintiffs contend that the VER Determination constitutes the Forest
Service's final decision on the validity of mineral rights at Canyon Mine and
therefore satisfies the first prong of the Bennett test. Defendants argue that
the determination is not a consummation of the agency's decisionmaking process,
but rather a preliminary step, with additional processes required before the
Forest Service could revoke or invalidate a Plan of Operations. Doc. 71 at
21-22; Doc. 123 at 6. They argue that the final decision on operation of the
Canyon Mine was the Plan of Operations and the 1986 ROD. Doc. 71 at 22-23.

The first part of the Bennett test asks whether the action marks the
consummation of the agency's decision making process. Bennett, 520 U.S. at
177-78, 117 S.Ct. 1154. As the Ninth Circuit has explained, "we look to see
whether the agency 'has rendered its last word on the matter.' " Oregon Natural
Desert Ass'n v. U.S. Forest Service, 465 F.3d 977, 984 (9th Cir.2006) (quoting
Whitman v. Am. Trucking Ass'n, 531 U.S. 457, 478, 121 S.Ct. 903, 149 L.Ed.2d 1
(2001)) (emphasis added).

In its order denying a preliminary injunction, the Court found that the VER
Determination is the last action the Forest Service can take on the validity of
the Canyon Mine claims and therefore satisfies the first requirement of the
Bennett test. Doc. 86 at 9-10. The Court continues to *1078 hold this view.
Although it is true that the Forest Service does not have the power to invalidate
mineral rights at the Canyon Mine (that responsibility lies with DOI) and that its
VER Determination would simply constitute evidence in any proceeding on the legal
validity of the mineral rights, the fact remains that the VER Determination is the
Forest Service's "last word" on the validity of the Canyon Mine mineral rights.
No additional Forest Service action is planned on this issue.

Defendants argue that the Forest Service retains discretion to conduct a VER
Determination at any time and that the Bureau of Land Management, a different
agency, may conduct its own inquiry into the validity. Doc. 123 at 12. As
Plaintiffs note, however, the fact that the Forest Service or some other agency
have discretion to take action in the future does not negate the fact that the VER
Determination is a final action by the Forest Service. See Bell v. New Jersey,
461 U.S. 773, 779-80, 103 S.Ct. 2187, 76 L.Ed.2d 312 (1983); Alaska v. EPA, 244
F.3d 748, 750 (9th Cir.2001) (decision consummated agency process even if agency
may adopt new position in response to changed circumstances); see also U.S. Air
Tour Ass'n v. FAA, 298 F.3d 997, 1013 (D.C.Cir.2002) ("if the possibility ... of
future revision in fact could make agency action non-final as a matter of law,
then it would be hard to imagine when any agency rule ... would ever be final as a
matter of law").

The Court concludes that the first element of the Bennett test is satisfied.
The VER Determination was not merely tentative or interlocutory in nature, it was
the Forest Service's last word on the validity of mineral rights at the Canyon
Mine. It marked the consummation of the Forest Service's validity determination.

3. Bennett Part 2: Legal or Practical Effect.

[4] In its preliminary injunction ruling, the Court found that Plaintiffs were
unlikely to satisfy the second prong of the Bennett test because the VER
Determination did not augment any rights or obligations related to Canyon Mine;
it merely recognized rights that existed at the time of the Withdrawal. Doc. 86
at 12. Having reviewed factual materials submitted by the parties and having
read more cases concerning the second prong of the Bennett test, the Court now
reaches a different conclusion.

In Bennett, the Supreme Court explained that the second prong is satisfied if
the action is "one by which rights or obligations have been determined, or from
which legal consequences will flow." 520 U.S. at 178, 117 S.Ct. 1154 (quotation
marks and citation omitted). Other cases shed light on this requirement. In
Franklin v. Massachusetts, 505 U.S. 788, 112 S.Ct. 2767, 120 L.Ed.2d 636 (1992),
the Supreme Court explained that the "core question" is whether the result of the
agency action "is one that will directly affect the parties." Id. at 797, 112
S.Ct. 2767. Although Franklin was decided before Bennett, the Ninth Circuit
quoted this language from Franklin in Oregon Natural Desert Ass'n, 465 F.3d at
982. The Ninth Circuit went on to explain that courts should look to whether the
agency action "amounts to a definitive statement of the agency's position" or
whether it "has a direct and immediate effect on the day-to-day operations of the
subject party." Id. (quotation marks and citation omitted). The Ninth Circuit
said the focus should be "on the practical and legal effects of the agency
action," and that the finality element must be interpreted "in a pragmatic and
flexible manner." Id. (quotation marks and citations omitted).

*1079 The factual materials presented by the parties show that completion of
the VER Determination was, at least, a practical requirement before the Canyon
Mine resumed operations. On September 23, 2011, the Forest Supervisor
responsible for the Canyon Mine, Michael Williams, wrote a letter to the executive
vice president of Energy Fuels. Mr. Williams explained that '[a] mineral exam is
scheduled to determine if your company has valid existing rights for the Canyon
Mine location. This is a requirement for any public domain lands managed by the
Forest Service that have been withdrawn from mineral entry[.]" Doc. 126-12 at 1
(emphasis added).

In a conference call with the Kaibab Paiute Tribe on January 10, 2012, in which
Mr. Williams participated, an employee of the Forest Service explained that "the
mineral exam will need to be completed before they start work at the Canyon Mine."
Doc. 118-15 at 1. The next day, in a telephone conversation with the Hualapai
Tribe, Mr. Williams stated that the owners of Canyon Mine "would not be able to
move forward without VER under the mineral withdrawal." Doc. 118-18 at 1.

Even more important than these communications, however, are Forest Service's
repeated statements in the VER Determination itself that the determination was
required for renewed operation of the mine: "It is Forest Service policy
(FSN2803.5) to only allow operations on mining claims within a withdrawal that
have valid existing rights (VER)." Doc. 126-3 at 5. This statement is repeated
on the next page. Id. at 6. Two pages later, the VER Determination states that
"[d]ue to the withdrawal, all locatable operations within this area must have
valid existing rights (VER) in order to be able to operate on these claims." Id.
at 8.

As authority for these statements, the VER Determination cites "FSN2803.5,"
which is a section in the Forest Service Manual, specifically in "Chapter-Zero
Code." Paragraph 5 of section 2803 of the Manual states that the Forest Service
should "[e]nsure that valid existing rights have been established before allowing
mineral or energy activities in congressionally designated or other withdrawn
areas." FOREST SERVICE, FOREST SERVICE MANUAL, FSM 2800-MINERALS & GEOLOGY, s
2803 (2012).

Other communications make clear that Energy Fuels did not intend to proceed
with renewed mine operations until the VER Determination was finished. A letter
from Energy Fuels' executive vice president to Forest Service employees concerning
the process of the VER Determination stated: "We would like to get the sample
analysis turned around as early as possible so that we can hopefully close this
out and proceed with our production plans." Doc. 118-16 at 1. An email from a
Forest Service employee to representatives of the Kaibab Paiute Tribe, sent the
day after the January 10, 2012 conference call mentioned above, contained this
statement: "I called our geologist, and was told that [Energy Fuels] will not be
doing any 'shaft sinking' at the site until the mineral exam is completed." Doc.
126-13 at 1.

Whether or not the law required Energy Fuels to wait until the VER
Determination was completed, these communications clearly show that the Forest
Service, Energy Fuels, and interested tribes all understood that mine operations
would not resume until the VER Determination was completed. It was a practical
if not a legal requirement. And as noted above, the Ninth Circuit has instructed
that courts should "focus on the practical and legal effects of the agency
action." Oregon Natural Desert Ass'n, 465 F.3d at 982. The *1080 Supreme
Court's direction that the "core question" is "whether the result of that process
is one that will directly affect the parties," Franklin, 505 U.S. at 797, 112
S.Ct. 2767, is also relevant. The documents quoted above make clear that the VER
Determination directly affected the parties-Canyon Mine operations would not
resume until the determination was completed.FN3

FN3. In an affidavit submitted with the preliminary injunction briefing, the
executive vice president of Energy Fuels states that the Forest Service
asked Energy Fuels to hold off on resuming mining activities "on a voluntary
basis" until the VER Determination was completed, and that Energy Fuels
voluntarily agreed. Doc. 59 PP 15-16. Accepting this statement as true,
the Court nonetheless concludes that the practical effect of the VER
Determination was to forestall new operations at the mine until the
determination was finished.

The difficult question for the Court is whether a practical effect alone is
sufficient to satisfy the second prong of the Bennett test. Bennett itself seems
to require legal consequences, referring to actions "by which rights or
obligations have been determined, or from which legal consequences will flow," 520
U.S. at 178, 117 S.Ct. 1154, and most cases discussing this prong focus on the
legal effects of an agency action. Plaintiffs have identified little legal
effect from the VER Determination-it does not create mineral rights, but merely
confirms they already exist; it is not required by the FLPMA or the Withdrawal,
FN4 although the Forest Service Manual does seem to suggest that it is necessary
before mining operations may occur on withdrawn lands; and Plaintiffs have
identified no specific legal consequences that flow from the determination itself.
And yet the Ninth Circuit clearly states that the Court should take not only a
legal, but also a "practical" and "pragmatic" look at the VER Determination.
Oregon Natural Desert Ass'n, 465 F.3d at 982. Other cases agree. See, e.g.,
Nat'l Ass'n of Home Builders v. Norton, 415 F.3d 8, 15 (D.C.Cir.2005) ("Finality
resulting from the practical effect of an ostensibly non-binding agency
proclamation is a concept we have recognized in the past."); Gen. Elec. Co. v.
Envt'l Prot. Agency, 290 F.3d 377, 383 (D.C.Cir.2002) ("if the language of the
document is such that private parties can rely on it as a norm or safe harbor by
which to shape their actions, it can be binding as a practical matter"). Viewing
the VER Determination from a practical point of view, the Court finds that it not
only "amounts to a definitive statement of the agency's position" on the validity
of the Canyon Mine mineral rights, but that it also had "a direct and immediate
effect on the day-to-day operations of the subject party"-once issued, it allowed
mining operations to resume under the original Plan of Operations. Id. The Court
therefore concludes that the VER Determination satisfies the second prong of the
Bennett test.

FN4. Plaintiffs cite to language in the FLPMA and the Withdrawal stating
that the Withdrawal is subject to "valid existing rights." See, e.g., Doc.
126 at 22 (citing Doc. 126-3 at 8; 43 U.S.C. s 1702(j)). But there is a
difference between valid existing rights and a valid existing rights
determination, and neither the statute nor the Withdrawal requires a
determination.

This conclusion is reinforced by the fact that the VER Determination seems to
fall within the actual language of Bennett. One of the circumstances identified
by Bennett as satisfying the second prong is when "rights or obligations have been
determined." 520 U.S. at 178, 117 S.Ct. 1154. The purpose of the VER
Determination was to determine rights-the existence*1081 of valid mineral rights
at the Canyon Mine site. The VER Determination thus appears to come within the
express language of Bennett.

4. Conclusion for Claims 1 and 4.

The Court concludes that the VER Determination is an agency action that
satisfies both prongs of the Bennett test. As a result, it is a final agency
action within the meaning of 5 U.S.C. s 704, and the Court has jurisdiction to
review Claims 1 and 4.

B. Claim 2.

Claim 2 asserts that Defendants failed to comply with s 106 of the NHPA before
completing the VER Determination. Section 106 provides:

The head of any ... Federal department or independent agency having authority to
license any undertaking shall, prior to the approval of the expenditure of any
Federal funds on the undertaking or prior to the issuance of any license, as the
case may be, take into account the effect of the undertaking on any district,
site, building, structure, or object that is included in or eligible for
inclusion in the National Register.

16 U.S.C. s 470f (emphasis added). Plaintiffs argue that the Canyon Mine is
an "undertaking" and that the VER Determination is an "approval" or "license"
within the meaning of this section. As a result, Plaintiffs contend, the Forest
Service was obligated to comply with this section before completing the VER
Determination.

Several issues are raised by this claim: (1) whether the Canyon Mine is a
"undertaking" within the meaning of s 106; (2) whether the VER Determination
constitutes an "approval" or "license" within the meaning of the section; (3)
whether consultation under this section would constitute a "final agency action,"
the omission of which can be reviewed by a court under the APA; and (4) whether
the claim is barred by res judicata, the statute of limitations, or laches.

1. Undertaking, Approval, or License.

In the Court's view, the parties' briefing does not fully and clearly address
whether the Canyon Mine is an undertaking for purposes of s 106 or whether the VER
Determination is an approval or license within the meaning of this section. In
addition, these issues are closely related to the merits of Claim 2. The Court
accordingly will defer consideration of these issues until the merits phase of
this case.

2. Final Agency Action.

The "final agency action" requirement of s 704 of the APA applies whether a
plaintiff seeks to "compel agency action unlawfully withheld or unreasonably
delayed" under s 706(1) or to "hold unlawful and set aside agency action" under s
706(2). The claim asserted in Claim 2 is the former-a failure to act claim under
s 706(1). Doc. 115, P 83.FN5 In Norton v. Southern Utah Wilderness Alliance,
542 U.S. 55, 124 S.Ct. 2373, 159 L.Ed.2d 137 (2004) ("SUWA "), the Supreme Court
held that such a claim "can proceed only where a plaintiff asserts that an agency
failed to take a discrete agency action that it is required to take." Id. at 64,
124 S.Ct. 2373 (emphasis in original). SUWA focused on what constituted a
discrete agency action that could be compelled under s 706(1) of the APA, but also
recognized that "[w]here no other statute provides a private right of action, the
"agency action" complained of must be "final agency action." " Id. at 62-63, 124
S.Ct. 2373 (emphasis in original).

FN5. Although the amended complaint is not entirely clear on this point,
counsel confirmed during oral argument that Claim 2 asserts only a failure
to act claim based on noncompliance with s 106 of the NHPA.

*1082 [5] The omitted action in Claim 2 is not the VER Determination, but the
Forest Service's alleged failure to engage in the consultation process required by
s 106 of the NHPA. Plaintiffs can assert this claim under the APA only if
consultation under s 106 would have been a final agency action. Id.

While the parties have not identified and the Court has not found any authority
explicitly addressing whether compliance with s 106 is itself a final agency
action, the Ninth Circuit has reviewed agency compliance with the s 106
consultation requirement in the past. See, e.g., Te-Moak Tribe of W. Shoshone of
Nevada v. U.S. Dep't of Interior, 608 F.3d 592, 607-10 (9th Cir.2010);
Muckleshoot Indian Tribe v. U.S. Forest Serv., 177 F.3d 800, 805-807 (9th
Cir.1999). Additionally, Plaintiffs asserted at oral argument that the result of
a s 106 consultation likely would have been a memorandum of agreement ("MOA") that
clearly would have legally binding effect.

The statute's regulations support this assertion. They suggest that an agency
should complete an MOA to show compliance with s 106 whenever adverse effects on
properties are found. See 36 C.F.R. s 800.6(a) (requiring consultation with
Indian tribes to develop and evaluate alternatives to avoid, minimize, or
mitigate adverse effects on historic properties); s 800.6(c) (noting that an MOA
evidences compliance with s 106). They also show that an MOA has legal
force-parties to an MOA must comply with its terms. s 800.6(c). Indeed, in Tyler
v. Cuomo, 236 F.3d 1124 (9th Cir.2000), the Ninth Circuit held that an MOA between
an agency and city, which resulted from a s 106 consultation, was legally binding
and enforceable by third-party beneficiary homeowners.

It appears that not every s 106 consultation results in an MOA. The regulations
imply that an MOA is required only when the agency's consultation identifies
potential adverse effects on historic properties. The fact that consultation
might not produce an MOA does not, however, alter the conclusion that s 106
consultation qualifies for judicial review. In Vieux Carre Prop. Owners,
Residents & Assoc., Inc. v. Brown, 948 F.2d 1436, 1445 (5th Cir.1991), the Fifth
Circuit reviewed an agency's obligation to consult under s 106 for a project that
was almost complete. Although the result of consultation under s 106 was
unknown, and the process might not have resulted in issuance of an MOA, the court
held that "as long as the park project is under federal license and the Corps has
the ability to require changes that could conceivably mitigate any adverse impact
... NHPA review is required." Id. at 1445. Other cases likewise "require that
NHPA be applied to ongoing Federal actions as long as a Federal agency has
opportunity to exercise authority at any stage of an undertaking where alterations
might be made to modify its impact on historic preservation goals." Id. at
1444-45 (citing Morris County Trust for Historic Pres. v. Pierce, 714 F.2d 271,
280 (3rd Cir.1983); Waterbury Action to Conserve Our Heritage, Inc. v. Harris,
603 F.2d 310 (2d Cir.1979); Thompson v. Fugate, 347 F.Supp. 120, 124
(E.D.Va.1972)).

Consultation with Plaintiff Havasupai Tribe in this case might well have
resulted in a legally enforceable MOA. The Court concludes that such a
consultation would be a final agency action under the two prongs of Bennett: (1)
completion of the consultation would constitute the culmination of the agency's
action under the NHPA with respect to the Canyon Mine, and (2) the process could
produce an MOA with legally enforceable effects. See Bennett, 520 U.S. at
177-78, 117 S.Ct. 1154.

*1083 Because the Court finds that a s 106 consultation would qualify as a
final agency action, the Court concludes that Plaintiffs may use the APA to
challenge the Forest Service's failure to conduct the consultation. 5 U.S.C. s
706(1).

3. Res Judicata.

[6][7] Federal Defendants argue that Claim 2 is barred by res judicata because
it alleges essentially the same NHPA cause of action that Plaintiffs 'might' have
pursued" in their prior litigation challenging the 1986 ROD. Doc. 71 at 24 (citing
Havasupai Tribe, 752 F.Supp. 1471). "The doctrine of res judicata provides that
'a final judgment on the merits bars further claims by parties or their privies
based on the same cause of action.' " In re Schimmels, 127 F.3d 875, 881 (9th
Cir.1997) (quoting Montana v. United States, 440 U.S. 147, 153, 99 S.Ct. 970, 59
L.Ed.2d 210 (1979)). Thus, res judicata applies whenever there is (1) an
identity of claims, (2) a final judgment on the merits, and (3) privity between
parties. Tahoe-Sierra Pres. Council, Inc. v. Tahoe Reg'l Planning Agency, 322
F.3d 1064, 1077 (9th Cir.2003).

[8] Defendants argue that the "identity of claims" requirement is satisfied
because Claim 2 is "essentially the same" as claims asserted in the earlier
action. Doc. 71 at 24. But the earlier claims challenged approval of the 1986
Plan of Operations for violating the Tribe's right to free exercise of religion
and a consultative duty under NEPA. Havasupai Tribe, 752 F.Supp. 1471. Claim 2
asserts a failure to comply with s 106 of the NHPA for a cultural property that
was not designated a TCP until 2010. That designation had not occurred at the
time of the prior suit and could not have been the subject of a s 106 claim.
Thus, Claim 2 is not the same as the claims brought in the earlier action, nor
could it have been brought in that action. Because there is no identity of
claims between the prior case and Claim 2, res judicata does not apply.

4. Statute of Limitations and Laches.

[9] Defendants argue that Claim 2 is barred by the statute of limitations and
laches because the 1986 ROD is the only agency decision that authorized mining at
Canyon Mine, and any claims challenging continued mining should have been brought
within six years of the ROD. Doc. 71 at 24-25 (citing 28 U.S.C. s 2401(a)). But
Claim 2 asserts that the VER Determination triggered the agency's obligations
under s 106 of the NHPA, and the statute of limitations would not have begun to
run for this claim until the VER Determination was issued in 2012 or the Forest
Service failed to engage in s 106 consultation as part of that determination.
Because those events occurred well within the six-year limitations period in 28
U.S.C. s 2401(a), Claim 2 is not barred by the statute of limitations. For the
same reason, it is not barred by the doctrine of laches.

IT IS ORDERED that Defendants' partial motion to dismiss (Doc. 71) is denied.